To ensure the better performance of VFD, Startup is very essential to avoid the unexpected damage or failures after a long/short shutdowns. Following startup maintenance of VFD and field devices must be carried out during the startups.
Checking and Cleaning
- Check if drive or panel is free from Dust,Oil, Mist and Harmful gases,Liquid
- Clean & remove the clogs if any in the VFD panel air suction louvers
- Use a suction type Vacuum pump to remove any dust content settled down or to remove spider cobwebs if any present around the panel or VFD
- Check the Conditions of all cable free from Damage/Cut
- Check the drive cooling fan working condition
- Check and Clean the VFD Heat-sink for better heat dissipation
- Ensure that no cable cut pieces or wire strands are lying near or inside VFD panel
Inspection of the VFD and Field conditions
| VFD to Field device |
- Verify the tightness of Power cable and Earth Cable
- Check the continuity of input and output cables for any damage caused due to unwanted circumstances
- Check VFD I/O terminals and relay output cables tightness
- Check the cable tightness of Field Inputs and outputs
- Components requiring lubrication must be re-inspected for dried up lubrication to prevent mechanical failures while powering on
- Check the tightness of cables and presence of rust on the components. Verify resistance of the DBR before powering on (If DBR presence)
- Check all brake/mechanical interlocks controlled by the VFD are properly wired and are functioning properly
- Visually check the condition of Motor winding and Cables for any sign of damage or corrosion
Earthing Test
![]() |
| Earth testing using ohm meter |
- Ensure to measure earthing resistance in the main earth pit against next pit after removing VFD earthing by using milli Ohm meter. Confirm ground resistance value of 5 Ohms or less as per IEEE standard
- Ensure to check the continuity of main Earth pit, motor earthing, panel earthing and VFD earthing. All should be in equipotential line
IR Test
| Insulation resistance b.w terminals |
- Disconnect VFD output cables and keep motor is connected
- Carry out the Megger test against U, V, W cable terminals with respect to Earthing and note the reading. (Test voltage 500/1000V)
- Insulation resistance should be >1MΩ for a duration of 3 seconds
Caution:
Do not use Megger to VFD as it may damage the VFD internal components
VFD Cold Test
With the help of a True RMS multi-meter which has Diode mode available, perform a cold check on the Diode and IGBT on the VFD before powering on.
Click here to know how to carry out VFD cold test
After Powering up the VFD
| Powered VFD to field |
- Power-up the VFD without any Run command for 15 minutes and allow the capacitor to charge uniformly.
- Check the DC bus voltage. It should be 560 ~ 570 VDC
- Check any abnormal noise,vibration or abnormal in operations
- Before giving the Run command ensure all interlocks are working as per requirement
- After all checkpoints are verified, run the equipment on no load condition and observe the operation for 30 Mins for any abnormality
- Check motor direction when forward/reverse command is fed
- Check and perform No load operation and check VFD No load current.
- Run the motor at slow speed and check the performance then gradually increase speed and check the operations
- Check for excessive vibration and shock loading
- Measure & confirm the currents are balanced in each phase (U, V, W) after full load or desire load of process requirement
- if everything is found ok, Resume normal operation